Plant Trial Work

Trial ObjectiveTo evaluate the performance of a new process or equipment in an industrial setting
Sample TypeOre, concentrate, or raw material used in the process
Scale of TrialPilot scale or full-scale (dependent on equipment size and capacity)
Feed RateVaries based on plant size (e.g., 1 to 1000 tonnes per hour)
Process DurationSeveral hours to multiple days (depending on trial objectives)
Control VariablesFeed rate, reagent dosage, air flow, temperature, pressure
Equipment UsedCrushers, mills, flotation cells, filters, etc., depending on the process
Reagent DosageAs per process requirements (e.g., 50-300 g/t for collectors in flotation)
Process ParameterspH, temperature, residence time, pressure, agitation speed
Monitoring ParametersRecovery rate, concentrate grade, energy consumption, water usage