bg_image
image
Snaab Consulting AB

Plant Auditing

Audit ObjectiveAssess process efficiency, equipment performance, and operational effectiveness
Plant TypeProcessing plant, manufacturing facility, power plant, etc.
Audit ScopeEquipment performance, process flow, material balance, energy consumption, environmental compliance
Duration of AuditVaries depending on plant size and complexity (typically 1 to 7 days)
Equipment InspectedCrushers, mills, pumps, conveyors, flotation cells, reactors, etc.
Data Collection MethodsOn-site measurements, process monitoring, sample collection, review of historical data
Key Performance Indicators (KPIs)Throughput, recovery rates, energy efficiency, downtime, product quality
Material BalancesMass and energy balance over the entire process or specific units
Sampling FrequencyBased on process dynamics, typically every 30 minutes to 1 hour
Energy UsageEvaluation of energy consumption (kWh/ton or similar metrics)
Water UsageWater consumption and recycling efficiency evaluation
Environmental ComplianceAir emissions, wastewater discharge, noise, and waste management practices
Reagent UsageMonitoring of chemicals or reagents used in processes (amount and efficiency)
Safety and MaintenanceReview of safety protocols, equipment maintenance schedules, and downtime logs
ReportingDetailed report outlining findings, recommendations for process improvement, cost-saving opportunities
Cost AnalysisEvaluation of production costs, energy savings, and operational expenditures
Follow-up ActionImplementation of recommended changes, re-audit scheduling, and monitoring for improvements